Before mounting the solar system, the customer agrees with the manufacturer the kind of solar system preferred. At the same time all the necessary details for proper installation of the system such as time and location are agreed.
Once the customer agrees with the manufacturer, the installer should visit the location of the system to measure the dimensions of the structure and then proceed.
For the best performance of the solar system, the solar panel should be placed in the right place to avoid any malfunctions in the near future.
It is essential that the manufacturer has in mind that the proper performance of the solar system only works when the heater is facing south for northern hemisphere and north to the southern hemisphere. It is important that the solar system is not shaded by trees or other obstacles.
The installation of the solar system must be based on the terms of the Agreement and in accordance with the local electrical and plumbing regulations.
If the water heater must be installed on the roof where the inclination angle is less than 15 ° or greater than 32 °, it is necessary to use a different standard equipment of the base of the device, similar to that used in areas that are prone to cyclones, thunderstorms and strong winds.
In areas with heavy snowfall and the temperature often goes down below 0 °, a closed circuit system should be selected.
Caution is required during the filling and connection of the closed circuit. Only qualified technicians can carry out this process. Please note that before filling the closed circuit with the thermal fluid it is first needed to completely fill the water tank.
Both tubes of the solar system and the pipes of hot and cold water should be well insulated and in good condition so that the system operates correctly.
After the heater has been installed in the right place, the installer should be careful how to fill and properly connect the circuit.
The electrical connection system (element) should always be used after filling the cylinder to avoid any damage to the electrical component (element).
For changing the electrical resistance (element) firstly the cylinder should empty and then subtract the resistance and install a new one and finally begin the process of filling the cylinder. During the filling do a visual check for leakage. If there is then we take the necessary procedures to avoid the leaking and the cylinder is ready for operation.
The manufacturer is free from any kind of damage that can occur after installing the system especially if the installer is not the one who will apply it. Responsible can be any plumber that has agreed with the client to install the solar system. The manufacturer declines any responsibility and neither the warranty is at force.